Good morning – please see below.  The FCG EV committee has put together a list of the Federal NEVI requirements for those of you pursuing grant funding for high-speed hubs.

Michelle Hershel
Director of Regulatory Affairs
Florida Electric Cooperatives Assoc.
2916 Apalachee Parkway
Tallahassee, FL  32301
Cell:  (850) 510-1693
(850)877-6166, ext. 3

NOTE: This e-mail is  intended solely for the use of the individual(s) to whom it is addressed.  The contents of this email and any attachments are confidential. If you believe you received this e-mail in error, please notify the sender immediately, delete the e-mail from your computer and do not copy or disclose it to anyone else. If you properly received this e-mail you should maintain its contents in confidence.

From: Tanya Portillo <tanyap@fcg.org>
Sent: Monday, February 20, 2023 9:47 AM
Subject: NEVI requirements

Good morning all.  Listed below is a shortened version of the Federal NEVI requirements for high-speed hub grant funding provided by Pete and Robert.

  1.  Must be at least 4 DCFC, may include Level 2
  2.  CCS Type 1, others can be provided but need to have 4 that are CCS compliant or capable of dual charging types
  3.  Each DCFC Must be able to simultaneously deliver 150 kW, each L2 must have at least 6kW/port simultaneous
  4.  Available to public 24x7
  5.  Contactless payment that accepts major credit and debit, must not require a membership, be accessible to persons with disabilities and non-English speakers
  6.  Level 2 must be energy star certified
  7.  Appropriate physical and cyber securities to protect consumer data, the chargers and grid
  8.  Maintained in compliance for a Minimum 5 years
  9.  Installed by a certified technician
  10. Ability for all users to report problems
  11. Compliant with data privacy
  12. Limitations on use of income from property and chargers (for Title 23 purposes)
  13. Can accommodate any network provider without hardware replacement
  14. Signage in compliance with MUTCD and 23 CFR part 750
  15. Detailed, per-port Quarterly and annual reports for usage and availability must be submitted
  16. Charger must remain operable even if the network connection is lost
  17. Pricing, location and real time availability is available on mapping applications
  18. Average up time greater than 97%
  19. All existing federal requirements still apply

Tanya Portillo
FCG Executive Director
3001 N. Rocky Point Drive E, Suite 410
Tampa, Florida 33607
(813) 418-0054
TanyaP@FCG.org<mailto:TanyaP@FCG.org>

This email and any of its attachments may contain FCG proprietary information that is privileged, confidential, or subject to copyright belonging to FCG. This email is intended solely for the use of the individual or entity to which it is addressed. If you are not the intended recipient of this email, you are hereby notified that any dissemination, distribution, copying, or action taken in relation to the contents of and attachments to this email is strictly prohibited and may be unlawful. If you receive this email in error, please notify the sender immediately and permanently delete the original and any copy of this email and any printout.