Padmounted CT/PT’s Paul Roberts 27 Oct 2022 17:27 UTC

Good afternoon gents,

Well we have made it this far without the need for a large underground primary metering installation. We now have a 11 MW load needing one. Wanted to poll the group if you have any similar large load you are having to meter and protect via underground 600A connections. Any specs on large pad-mounted 25kV CT/PTs and any design drawings for the pad-mounted recloser and metering layout they would be willing to share.

Again thanks to all!

Paul Roberts
VP of Engineering
Peace River EC